Work with drywall can be carried out at a temperature above 15 degrees. In addition, two days before the start of work and the same after their end, the room should maintain the same temperature regime.
Work with drywall can be carried out at a temperature above 15 degrees. In addition, two days before the start of work and the same after their end, the room should maintain the same temperature regime.