Now we proceed to direct preparation of the floor in the room. We take out all the furniture so that it does not interfere during the work. We clean the floors of dust and dirt, you can even wash them. Spin screws in skirting boards and carefully remove them. It makes sense to primed the floor — just get rid of cracks and cracks that can be in the floor. Thanks to this, the carpet will fall on the floor and will not fail. If the carpet is laid on the tree, then you should make sure that there is no gap or unevenness on it. After that we lay the carpet and let him lay down for a while. Then lubricate it from the inside of the glue and glue it to the floor.