The construction of buildings from monolithic concrete is significantly different from other methods of construction. It consists in the fact that the formwork is first erected on the construction site, the reinforcement is inserted along the contour of the built house, only after which concrete is poured or placed. When the concrete hardens, it will represent the finished element of the building, in the case when the collapsible formwork is used — it becomes part of the elevated wall, and the formwork is dismantled. This construction technology was used in 1908, its famous inventor Edison applied it, and received a patent that operated in the United States for 20 years, but now everyone can use it.