First you need to mark the marking, which repeats the location of the supporting external and internal walls of the house. Then proceed to digging trenches. If the work is carried out on a stable soil with a deep occurrence of groundwater, there is enough depth of 50-70 cm. But sometimes there are few and 150 cm if the conditions are unfavorable.