However, the conditions of laying require impeccable observance as the final stage of finishing work. The walls are plastered. No high humidity or low temperature (from 10 degrees). In the alignment of the floor, mixtures with self -leveling properties or cement screed are used. Inattention to these conditions can lead to defects and deformation of the board, and the loosening of the castle joints will finally destroy the quality of the styling.