In order to correctly make an euro -collection, it is necessary to adhere to a certain sequence of initial works. First you need to consider everything correctly by the location of the fence, given the buildings and vegetation encountered on the path. It must be remembered that the distance between the pillars should be 205 cm. After marking the site for the future fence, starting with installation work, soil is diverted at the place of the column location. The installation of the pillars is performed simultaneously with the lower plate of the fence, using the level. After which, pits with installed pillars are recorded using concrete. The process of installing an euro -intake can be simplified if the pillars are not concrete immediately, but after installing them around the entire perimeter along with the lower plate of the fence, this reduces the risk of distances error during installation. After solidification of concrete, the remaining slabs of the fence in the grooves of the pillars are also installed. After installing the fence, the joints between the plates are sealed, for this they use the usual putty for external work. So that the fence is durable and resistant to different natural precipitation, it must be covered with a primer with deep penetration, or just opened with acrylic paint for facades.