We are developing a route of movement
The route must be developed in advance not only for the convenience and speed of transportation of construction equipment. Negabarit construction engineering may not pass under bridges or wires on certain sections of the road. Many bridges and crossings are limited by the weight of the technique passing through them. This also needs to be taken into account when laying the route.