When attaching to drywall, additional profiles or wooden beams are installed at the stage of mounting the cladding. If such an opportunity was missed, special dowels are used for fastening. The load that holds the mount to the GCL should not exceed 8 kg. Therefore, if possible, the fastening is carried out to the base or to the profile of the frame. Fastening of the cornices is carried out using special brackets that are sold with them in the kit, or suitable corners. Different options for fastening the cornice are possible: