From the horizontal crossbar of at least 30 centimeters, the upper ends of the pipes need to be done already than the lower.
In order to avoid dirty sewage in a horizontal overflowing pipe, the upper ends are raised higher by 20 centimeters, then from there to the second container. Next, an additional tidal system is installed on each side against each other, two more pipes without reaching the ceiling level for two bricks.