The walls are plastered in the following order.
The surface marking is initially carried out for the subsequent installation of special beacons, which are used if the surface with significant changes and irregularities. Then 1-2 times apply a primer layer to remove moisture, dirt and dust from the surface and increase the clutch of the plaster with the wall.