So, Yu. E. Pak noted that the growth of labor productivity in the nine five -year plan in construction is supposed to be achieved by improving the organization of construction production (23%of the increase), increasing the degree of collection and application of effective materials (32%), the introduction of the scientific organization of labor (17%) and increasing the level mechanization and automation of work (28%).