Under good conditions of weather and normal soils during the construction of a dwelling, you can not establish the formwork for buildings with basement and semi -basement rooms. The walls of the pit will play the role of formwork. After the concrete hardening, the earth from the basement is removed manually or using the equipment for land work. After choosing a suitable land plot, the internal wall of the foundation should be meticulously hubby and washed.