The final hardening occurs after about two weeks. Do not forget to cover the seams filled with testing if the surface of the cladding is in the room with high humidity. Alcohol tiles should also be protected. Always follow the instructions for the preparation and application of the protective composition. If it is said that the solution is suitable only for seams, then it should be cleaned from the surface of the tile until hardened.