Laying wires
The wire before laying must be rolled up. The wire is laid from the long room. Do everything in stages: they laid the wires from sockets to the main dose box in the room, launching for lighting began. Mark all the wires with an ordinary black marker so as not to get confused when connecting in an electric shield. From dose and mounting boxes, wires should stick out 30 cm for stock. For an electrical panel, a supply of 1 m for each wire.