4. You can start installation. Remove a little insulation from the wires and dilute the ends to the sides. The bare wire along the length should be 3-5 mm. Find two phase and «zero» wires. The phase goes to the switch, and zero in the box.
4. You can start installation. Remove a little insulation from the wires and dilute the ends to the sides. The bare wire along the length should be 3-5 mm. Find two phase and «zero» wires. The phase goes to the switch, and zero in the box.