First of all, it is necessary to check the supporting walls and internal partitions of the wooden house. This is the last opportunity to change something in the project, add something and get rid of something. If you independently studied and coordinated the project of the House of Loss, then no alterations may not be required. It is also necessary to verify the design documentation very carefully. After all, your desire to remake something at the last moment, can affect the styling of communications, television cables, electric wires, water supply and sewage.